London
Haringey
55.1% of homes are below EPC C
Based on analysis of 145,293 EPC certificates
0.2% better than the national average of 55.3%
55.1%
Below EPC C
80,004 properties
145,293
Properties analysed
EPC certificates
£525.4M
Estimated upgrade cost
to bring all to EPC C
202 / 346
National rank
Better half nationally
Compared to the national average
Haringey has 55.1% of homes below EPC C. This is 0.2 percentage points better than the national average of 55.3% for England and Wales. It ranks 202 out of 346 local authorities, where rank 1 is the worst performing.
EPC Rating Distribution
A0.1%194
B11.5%16,729
C33.3%48,365
D39.9%58,020
E12.4%18,057
F2.1%2,988
G0.6%939
Ratings D, E, F, and G are below the proposed 2030 minimum standard of EPC C.
Property Type Breakdown
| Property Type | Total | Below C |
|---|---|---|
| Flat | 94,782 | 46.1% |
| House | 41,987 | 75.0% |
| Maisonette | 7,885 | 56.5% |
| Bungalow | 639 | 64.8% |
Construction Age Breakdown
| Age Band | Total | Below C |
|---|---|---|
| before 1900 | 19,041 | 77.7% |
| 1900-1929 | 49,612 | 75.1% |
| 1930-1949 | 20,963 | 67.7% |
| 1950-1966 | 8,407 | 53.5% |
| 1967-1975 | 10,667 | 40.0% |
| 1976-1982 | 5,164 | 25.9% |
| 1983-1990 | 3,603 | 25.3% |
| 1991-1995 | 3,073 | 26.2% |
| 1996-2002 | 2,378 | 13.8% |
| 2003-2006 | 2,876 | 7.6% |
| 2007-2011 | 1,125 | 2.2% |
| 2012-2021 | 181 | 1.1% |
| 2022 onwards | 3 | 0.0% |
Tenure Breakdown
| Tenure | Total | Below C |
|---|---|---|
| Private rental | 52,714 | 62.0% |
| Owner-occupied | 45,486 | 66.4% |
| Social rental | 31,444 | 47.8% |
Additional Statistics
£585/yr
Avg heating cost
74 m2
Avg floor area
3.1 t/yr
Avg CO2 emissions
58.8%
Solid wall (uninsulated)
9.8%
No mains gas
For Editors
Pre-written quote
“Haringey has 55.1% of its housing stock below the proposed 2030 EPC minimum standard, with an estimated upgrade cost of £525.4M. This places it 202 out of 346 local authorities in England and Wales.”
EPCGuide Research Team
Shareable Summary
EPCGuide Research
Haringey
55.1%below EPC C
145,293 properties analysed
£525.4M estimated upgrade cost
Rank 202 of 346 local authorities
epcguide.co.uk/research/areas/haringey